Unit 1 strip out cloakroom?. Leave cupboards for now 1 hr fire curtain in loft space over kitchen/electrics fill in opening to servery or make closable 1 hour ceiling to boiler etc new ext door Unit 2 check loft space to unit 1 fire curtain if necessary new ext door Unit 3 build up wall between 3 and 4 and return to central space ground floor blockwork with door timber frame 1 hour over using existing framework new ext door Unit 4 strip out toilet and remove part partitioning leave other partitions for now build up wall to central area with new door as unit 3 new ext door and one fixed panel (check ceiling level) Unit 5 re-fix sill and other items no external door here as adjacent to main door. Unit 6 strip out staff toilet and disabled toilet, new partition at left of entrance door remove other partitioning subject to loadbearing check fire curtains over both side walls replace window with new door and side light. Area 7 toilets strip out children's toilets Boys' toilet to be 1 disabled cubicle + 1 ladies' cubicles, Girls' toilet to be urinal and one cubicle. Area 8 public space remove partitioning as far as possible (determine later) 1/2 glazed door to each unit clear roof lights and investigate possible leak New pair entrance doors. Make good damaged ceilings etc Locks Euro locks 3-star to all units (2 per unit) and main doors, each unit inner and outer on one key and any unit can also open main door. Outside refurbish window frames replace downpipe unit 3 and at boiler house clear rear path allow for removal of wooden fencing and wire fencing to sliding barrier and debris appoint Crawfords nominated supplier for joinery?